Services Provided

  • Rainfall (R24) and river discharge data collection from the catchment area under the management of Balai Besar Wilayah Sungai (BBWS) Way Sekampung-Mesuji.;
  • Prepare water supply & demand projection analysis;
  • Performed the cumulative frequency distribution (flow-duration curve, FDC) of daily flows;
  • Application of the Weibull distribution for low-flow frequency analysis;
  • Estimated of flow duration and low flow and performed frequency curves at un-gauged site;
  • Conduct low-flow frequency analysis;
  • Prepare a comprehensive report for the Client

Project Summary

Name of Client:  PDAM Tirta Albantani Serang and Kyunghwa Engineering of Korea

Project Name: “Preparation Outline Business Case (Pre-feasibility study) for PPP Sindangheula (Q 700 lps) and Pamarayan (Q 1,500 lps) Water Supply Systems, total capacity 2,200 lps”

Location: Banten Province